To enhance public transportation and improve mobility and quality of life in the Berkshires, the Berkshire Regional Planning Commission (BRPC), on behalf of the Berkshire Metropolitan Planning Organization (BMPO), and in collaboration with the Berkshire Regional Transit Authority (BRTA), is currently soliciting proposals from qualified consultants to conduct a comprehensive analysis of BRTA Routes and Integration of On-demand/ Microtransit service.
RFP Questions & Answers
- To support the line-by-line analysis mentioned on page 14, does BRTA have recent ridership counts available at the bus trip and bus stop level? If so, could you provide an example of the count data?
Currently, BRTA doesn’t have reliable ridership data at the bus stop level. They are in the process of acquiring new ITS software; they will soon have the vendor on board. With the new ITS system, BRTA will be able to access bus-stop-level ridership data, which will be made available for analysis in February.
- Has BRTA or BRPC conducted an on-board passenger survey within the past two years? If so, can you provide the survey report or the survey questionnaire?
BRTA conducts an on-board passenger survey for its reporting. I don’t know when BRTA last conducted a passenger survey in 2025/2026. This information will be made available to the consultant for analysis after the contract is awarded.
- What software platform does BRTA currently use for its existing microtransit service?
Currently, BRTA uses RouteMatch for Fixed Routes and Paratransit, but it will soon migrate to a new software platform. They are in the process of awarding the contract for a new ITS system/ Software. BRTA doesn’t currently operate a Microtransit service. The only Microtransit service in Berkshire County is the South County Connector. The Town of Great Barrington runs the South County Connector service in Southern Berkshire County in coordination with the other six Towns in South County. https://www.socoride.org/
You can find BRTA’s information at:
https://berkshirerta.gov/about/open-government/
- Are resumes required in the staffing section? If so, do those count towards the page limit?
Yes, a brief description of staff assigned to the project is needed. The staff resumes, previous work examples, and other supporting documents can be added as appendices/attachments, which will not count towards the page limit.
- Are we allowed a table of contents page? If so, does that count towards the page limit?
Yes, you can add a table of contents page; it will not count towards the page limit.
- Can the digital (.pdf) copy of the technical proposal and price proposal be provided on the same USB drive, provided they are clearly labeled?
Please provide the Technical Proposal and Price Proposal on two separate USB drives and label each drive.
- The link to download the BRPC’s Public Participation Plan (page 19) does not appear to be valid. Will you provide a new link or provide the document?
https://berkshireplanning.org/wp-content/uploads/2020/06/Berkshire-MPO-Public-Participation-Plan.pdf
- When does BRPC anticipate providing responses to questions?
As we receive the questions.
- Page 9 of the RFP states that the technical proposal may not exceed 18 pages. However, the page counts identified per section of the technical proposal identified on pages 7-9 on total 15 pages. Please clarify if additional pages are allowed for the technical proposal and, if so, in what section(s) they may be added.
Technical Proposals up to 15 pages (18 pages max). If required, the three additional pages in the technical proposal can be added to the Statement of Approach section.
- Are pages with no technical content (e.g., cover, table of contents) excluded from the page limit?
Yes, the cover and table of contents are excluded from the page limit.
- Has a date or date range for potential interviews been identified? Will interviews be in person or virtual?
No, we will not conduct interviews. The contract will be awarded to the most advantageous proposal, based on the evaluation of proposals and prices. The technical and price proposals will be evaluated based on the evaluation criteria identified on pages 18-21 of the RFP.
- Is a comprehensive operational analysis of the South County Connector service included in this project?
No, a comprehensive operational analysis of the South County Connector Service is not included in this project.
- Is an analysis of the BRTA ADA paratransit service and/or senior rural service included in this project?
No, BRTA’s ADA paratransit service and/or senior rural service are not included in this project—only the BRTA’s Fixed Routes.
- What level of performance data is available for the BRTA fixed-route service? What stop-level data is available?
Currently, BRTA doesn’t have reliable ridership data at the bus stop level. They are in the process of acquiring new ITS software; they will soon have the vendor on board. With the new ITS system, BRTA will be able to access bus-stop-level ridership data, which will be made available for analysis in February.
- The RFP indicates BRTA provides 15 fixed routes. However, the BRTA website only lists 13 fixed routes. Are there other routes operated by the BRTA that are not listed as fixed routes on its website?
There are currently 13 Fixed Routes. BRTA also provides Link 413 service and a limited Community Shuttle service.
- When was the most recent fixed-route customer survey conducted onboard BRTA?
BRTA conducts an onboard passenger survey for its reporting. I don’t know when BRTA last conducted a passenger survey in 2025/2026. This information will be made available to the consultant for analysis after the contract is awarded.
- When was the most recent community survey regarding transportation or transit conducted within Berkshire County?
BRTA conducts an onboard passenger survey for its reporting. I don’t know when BRTA last conducted a passenger survey in 2025/2026. This information will be made available to the consultant for analysis after the contract is awarded. BRPC conducted a transportation survey in 2024, which will be made available for analysis.
- Page 15 of the RFP indicates BRTA is currently integrating new technology and ITS software. What technology is currently being implemented?
Currently, BRTA uses RouteMatch for Fixed Routes and Paratransit, but it will soon migrate to a new software platform. They are in the process of awarding the contract for a new ITS system/ Software. BRTA doesn’t currently operate a Microtransit service.
You can find BRTA’s information at:
https://berkshirerta.gov/about/open-government/
- Please clarify if any presentations of the final report are required. If so, how many?
Pages 12 and 13 of the RFP identify presentations at the mid- and final recommendations of the study to Transportation Boards.
- Can you clarify expected content and functionality for the project website?
The consultant will create a Project website (ArcGIS Hub site) at the start of the project for public outreach, explain the project goals and outcomes, and post reports/ findings and other updates.
- Is the consultant providing content for an existing website or maintaining a separate project website?
The consultant will create a separate hub site, maintain it throughout the study period, and hand it over to BRPC at the end of the project.
- You stated that the “Non-Price/Technical Proposal may not exceed eighteen (18) total pages (excluding attachments)”, but these sections equal to 15 pages. Can you clarify the page limits?
Transmittal Letter – 2 pages
Background and Experience – 5 pages
Staffing Proposal – 3 pages
Statement of Approach – 5 pages
Technical Proposals up to 15 pages (18 pages max). If required, the three additional pages in the technical proposal can be added to the Statement of Approach section.
- Can we include a cover and a cover letter to the proposal and have it not count towards the page count?
Yes, you can add a cover and a cover letter; it will not count towards the page limit.
- We are committed to sustainable business practices that reduce the environmental impacts of our operations. To encourage waste reduction, would BRTA consider submittal of electronic copies instead of printed copies?
No, as stated in the RFP pages 9 and 10:
One (1) hard copy file and one (1) digital copy in read-only PDF format on a flash drive shall be included in the submission packages for both the price and non-price/technical proposals.
- The section for Staffing Proposal is limited to 3 pages. Can we attach full resumes in an appendix, separate from this section, and have it not count towards the page limit?
Yes, you can attach full resumes in an appendix, and they will not count towards the page limit.
- For both the schedule and the budget, can we use a larger 11×17 page, and count it as a single page?
Yes, you can use a larger 11×17 page for the schedule and the budget, and it will be counted as a single page.
- Can you provide a sample contract?
BRPC’s sample contract is attached.
- Can you describe the specific activities meant by “maintain” in the scope item pertaining to the study website?
The consultant will create a Project website (ArcGIS Hub site) at the start of the project for public outreach, explain the project goals and outcomes, and post reports/ findings and other updates. The consultant will maintain the site throughout the study period and hand it over to BRPC at the end of the project.
- Can you clarify how cost is scored? Is it a yes/no for not exceeding the maximum budget, or scaled based on lowest cost?
As stated on page # 20 of the RFP:
For Criterion G – Cost, the respondent’s total cost doesn’t exceed the budgeted amount of $155,000 for this BRTA Routes Analysis study effort—the lowest responsive price proposal. (Price proposals above $155,000 will be considered nonresponsive). The contract will be awarded to the most advantageous proposal, based on the evaluation of proposals and prices.
- Task 3 includes activities such as vetting software solutions and assessing their integration with BRTA’s new ITS system. Would BRTA consider a potential conflict of interest if a consultant is affiliated with a microtransit software developer? If so, would BRTA be comfortable with a subcontractor with no such affiliation performing this task?
Yes, BRTA will consider a potential conflict of interest if a consultant is affiliated with a microtransit software developer. BRTA recently procured a new ITS system/software. They conducted the RFP process and awarded the contract to Spare Lab. Currently, BRTA runs Fixed Routes and Paratransit service. In the future, BRTA will utilize the Spare Lab platform to integrate Microtransit Service. BRTA’s service provider is Keolis, and BRTA plans to provide the Microtransit service in-house using its vehicles and Keolis’s service.
- Are electronic signatures acceptable for the RFP submission, or are original ink signatures required?
Yes, electronic signatures are acceptable for the RFP submission.
- What was the focus of the transportation survey conducted in 2024?
BRPC conducted a transportation survey for the 2024 Regional Transportation Plan. Chapter 2 of the 2024 RTP document contains the transportation survey findings.
- Is the report of the 2024 transportation survey available online?
- Will the presentations to the Transportation Boards be in person or virtual?
Currently, the Transportation Board meetings are virtual, so yes, the presentations will be virtual.
- Will results of BRPC’s 2026 Berkshire Transportation Access Survey be made available to the successful consultant? What was the primary focus of this survey?
Yes, the survey is being conducted as part of the Berkshire Transportation Access Project (BUILD Initiative).
- Page 9 of the RFP states that the “Non-Price/Technical Proposal may not exceed eighteen (18) total pages (excluding attachments)”; however, the page limits for each section equal to 15 total pages. Please clarify whether the 18-page maximum for the Non-Price/Technical Proposal permits proposers to exceed the stated individual section page limits by allocating the additional 3 pages among those sections, provided the Non-Price/Technical Proposal remains within the overall 18-page limit.
Technical Proposals up to 15 pages (18 pages max). If required, the three additional pages in the technical proposal can be added to the Statement of Approach section.
- Please clarify whether covers and section dividers are included in the stated page limits for the Non-Price/Technical Proposal and the Price Proposal, or whether these items are excluded from the respective page counts.
No, covers and section dividers will not count toward the page limit.
- Please confirm whether BRPC would like proposers to include resumes for key personnel proposed for the project. If resumes are desired, may they be included as attachments and excluded from the Non-Price/Technical Proposal page limit?
Yes, a brief description of staff assigned to the project is needed. The staff resumes, previous work examples, and other supporting documents can be added as appendices/attachments, which will not count towards the page limit.
- Are there any planned, conceptualized, or recently approved BRTA fixed-route modifications, service reductions, or restructuring initiatives that the consultant should consider as part of the baseline network?
No, there aren’t any planned, conceptualized, or recently approved BRTA fixed-route modifications, service reductions, or restructuring initiatives that the consultant should consider as part of the baseline network.
- Should the study evaluate the existing network as operated today or an anticipated FY2027 service configuration?
The study should evaluate the existing network as operated today.
- What historical operating and ridership data will BRTA make available to the selected consultant?
NTD data and what BRTA has available.
https://berkshirerta.gov/about/open-government/
- Specifically, will route- and trip-level ridership, revenue hours and miles, operating costs, on-time performance, and passenger boarding data be available for FY2025 and FY2026? In what formats will these datasets be provided?
NTD data and what BRTA has available.
https://berkshirerta.gov/about/open-government/
- BRPC indicated that stop-level ridership data is expected to become available in February Will this be newly collected data starting in February, or will historical data also be available?
Newly collected data using the new ITS system/ Spare Platform from November/December 2026 to February/current
- What specific data elements are expected, and is the analytical schedule flexible if the new system’s implementation is delayed?
The analytical schedule may be adjusted based on data availability, but the project must be completed by September 30, 2027.
- How is ridership data currently collected, and at what level of detail or granularity?
Currently, BRTA doesn’t have reliable ridership data at the bus stop level. BRTA used farebox data for ridership, but BRTA has been fare-free for a year, and ridership data is manually entered by drivers.
- If new ITS-derived ridership data is unavailable until February 2027, or if the initial collection period is insufficient for a representative performance evaluation, would BRPC accept an approach that combines available historical ridership, operational data, and supplemental analysis to establish the baseline, with subsequent validation using the new ITS data?
Yes
- Will the selected consultant have access to the underlying GIS datasets, travel-demand analysis, Replica outputs, assumptions, and other supporting materials developed for the 2025 Berkshire County Microtransit Feasibility Study?
No, we don’t have access to the raw data (it was the consultant’s data). Final reports can be accessed at:
https://brpc-fitp.hub.arcgis.com/
- Is the intent for the consultant to build on those findings rather than independently reproduce the previous study’s regional needs assessment?
It is up to the consultant, but yes, the intent is for the consultant to build on those findings rather than independently reproduce the previous study’s regional needs assessment. The focus of this study is the in-depth analysis of BRTA routes and the integration of On-demand/Microtransit.
- BRPC has clarified that the study will focus on BRTA’s 13 fixed routes. Should Link 413, the Community Shuttle, and the private or not-for-profit services also be considered when evaluating network connectivity, transfer opportunities, and potential microtransit integration, even though they are not included in the detailed fixed-route analysis?
Yes, if feasible for potential microtransit integration, the consultant should consider Link 413, the community shuttle, and other BRTA-operated services when evaluating network connectivity.
- Is BRPC seeking recommendations that may include consolidating, realigning, or replacing low-productivity fixed routes with microtransit, or is the primary objective to identify complementary microtransit services that improve coverage while largely preserving the existing fixed-route network?
Yes, BRPC is seeking recommendations that may include consolidation, realignment, or the replacement of low-productivity fixed routes with microtransit.
- Has BRTA established service-coverage, financial, labor, or operating requirements that would limit the consolidation, modification, or replacement of existing fixed routes?
No, not that I am aware of.
- Should proposed alternatives assume a cost-neutral reallocation of existing operating resources, or may the consultant evaluate scenarios that require additional operating investment?
Proposed alternatives should assume a cost-neutral reallocation of existing operating resources and provide scenarios that require additional operating investment.
- Have BRPC or BRTA established preferred initial microtransit service areas, operating models, or implementation priorities based on the 2025 feasibility study?
North County is the preferred initial microtransit service area, followed by Central County.
BRTA recently acquired a new ITS system/software. They conducted the RFP process and awarded the contract to Spare Lab. Currently, BRTA runs Fixed Routes and Paratransit service. In the future, BRTA will utilize the Spare Lab platform to integrate Microtransit Service. BRTA’s service provider is Keolis, and BRTA plans to provide the Microtransit service in-house using its vehicles and Keolis’s service.
- Are any services already funded or being advanced toward implementation?
The only Microtransit service in Berkshire County is the South County Connector. The Town of Great Barrington runs the South County Connector service in Southern Berkshire County in coordination with the other six Towns in South County. https://www.socoride.org/
- To what extent should the consultant independently reassess these priorities rather than refine and operationalize previously identified recommendations?
It is up to the consultant.
- What level of analytical detail is expected for the microtransit scenarios?
It is up to the consultant, based on what they see is needed.
- Would planning-level ridership forecasts, vehicle requirements, service productivity estimates, and operating cost models satisfy the scope, or is the consultant expected to conduct detailed microtransit simulation to evaluate vehicle utilization, passenger wait times, and service reliability?
Yes, to some extent, the consultant is expected to evaluate vehicle utilization, passenger wait times, and service reliability. Planning-level ridership forecasts, vehicle requirements, service productivity estimates, and operating models were analyzed as part of the Microtransit Feasibility Study.
https://brpc-fitp.hub.arcgis.com/
- Given BRTA’s selection of Spare Labs as its new ITS/software provider, what level of technology evaluation does BRPC expect from the selected consultant?
The technology evaluation would be how the proposed enhanced Fixed Routes and the integrated On-Demand/Microtransit service will work/interact with the Spare Labs platform.
- Will the selected consultant have direct access to Spare Labs personnel and relevant technical documentation, including system capabilities, data interfaces, integration requirements, and operational specifications, to support the development and evaluation of fixed-route and microtransit service alternatives?
BRTA will provide support; if needed, will provide contact information for Spare Lab personnel for direct interaction.
- Should the analysis focus on developing service configurations and operating requirements compatible with Spare Labs, or does BRPC expect an independent assessment of additional technology solutions and integration alternatives?
Yes, the analysis should focus on developing service configurations and operating requirements compatible with Spare Labs.
- Are there existing operational constraints that should inform the development of service alternatives, such as vehicle availability, maintenance and storage facilities, staSing levels, collective bargaining agreements, or restrictions on contracted service delivery?
BRTA will provide needed information for analysis to the consultant awarded the contract.
- Will BRTA provide current, fully allocated operating costs and fleet information to support the financial analysis?
BRTA will provide needed information for analysis to the consultant awarded the contract.
- What planning horizon is expected for the phased microtransit implementation plan, and what level of cost detail is required?
One to three years. Itemized implementation cost.
- Should the consultant develop planning-level capital and operating budgets for each implementation phase, or more detailed operational budgets suitable for future procurement and funding applications?
More detailed operational budgets suitable for future procurement and funding applications.
- Is the intended final product a strategic implementation plan that identifies recommended service areas, operating parameters, phasing, costs, and funding, or is the consultant also expected to develop procurement-ready materials, such as detailed service specifications, vehicle and software requirements, and operational performance standards?
Detailed service specifications, vehicle requirements, and operational performance standards. BRTA will utilize the newly acquired Spare Lab’s ITS technology for software requirements.
- Beyond the three to four virtual committee meetings and milestone presentations described in the RFP, does BRPC anticipate a minimum number of in-person public meetings, workshops, or stakeholder interviews?
BRPC expects the consultant to hold at least one in-person public meeting/pop-up in each of North and Central County—and to provide online public engagement opportunities throughout the study.
- Will BRPC support coordination, advertising, and stakeholder recruitment?
Yes
- Is the consultant expected to administer a new public survey or primarily rely on existing surveys, supplemented by targeted engagement?
Yes, a new public survey to supplement the targeted engagement.
- Would BRPC consider an engagement approach that incorporates targeted in-person community planning workshops or interactive service-design sessions instead of more conventional public meetings, provided the required Steering Committee and transportation board presentations are maintained??
BRPC doesn’t have a preference; at least one in-person public session in each North and Central County—and to provide online public engagement opportunities throughout the study.
- Will BRPC provide access to its ArcGIS organizational environment for developing and eventually transferring the project website, or should the consultant assume responsibility for providing the necessary licensing and hosting resources?
The consultant should assume responsibility for providing the necessary licensing and hosting resources.
- Does BRPC expect the consultant to conduct a formal Title VI service equity analysis for proposed fixed-route modifications, including any applicable MassDOT or federal requirements, or is a planning-level equity assessment of service alternatives sufficient? If a formal equity analysis is required, what methodology, thresholds, and documentation standards should be applied??
A planning-level equity assessment of service alternatives is sufficient.
- In addition to the final report, are editable GIS files, financial models, service-planning datasets, and other technical materials expected as separate deliverables?
No, not everything, but some editable GIS files – like updated BRTA routes, some graphics, etc.
- Given the breadth of the technical scope and the importance of BRPC’s responses to questions, would BRPC consider extending the current November 20, 2026, proposal submission deadline by approximately two weeks?
No, we don’t plan to extend the deadline. If we plan to change the deadline mid-next week, we will inform the consultants in our database and post it on our website.