Berkshire Regional Planning is working with the Town of Clarksburg and the Briggsville Water District as they upgrade water lines to become more climate resilient from drought and flooding. The project includes engineering a new water tank relocated out of the floodplain, improved and if possible relocated water lines out of the flood plain, and increased size to be resilient against drought conditions. BRPC is supporting by providing outreach services and grant administration guidance.