MassDOT Virtual Design Public Hearing – Lee, Meadow St. Bridge Replacement

LEE – BRIDGE REPLACEMENT, L-05-004, MEADOW STREET OVER POWDER MILL BROOK

This project proposes to replace Bridge L-05-004 in the Town of Lee, which carries Meadow Street over Powder Mill Brook (a.k.a. Beartown Brook). The bridge was closed due to its deteriorated condition and a temporary single lane bridge with alternating traffic has been placed over the existing bridge until a new permanent structure is constructed by this project. The project will not significantly change the existing geometry of the roadway and will restore a two-lane vehicle bridge over Powder Mill Brook. The existing bridge span will be lengthened to provide a wider hydraulic opening for Powder Mill Brook, stream scour counter measures and stream bank habitat improvements will be installed upstream of the bridge.

Wednesday, September 6th, 2023 7:00PM

www.mass.gov/orgs/highway-division/events

Lee, Meadow Street Bridge Replacement Public Hearing Announcement Flyer